Orbital IT Teams with NVIDIA on DSX AI Factory Infrastructure. Read more

Data Center Engineering & Procurement

Orbital IT engineers and procures the data center infrastructure AI workloads need, designing thermal and electrical systems from first principles, covering cooling and airflow management, power distribution, power generation, and architecture. Every design is construction-ready, and validated against your power profile and site constraints before any metal is cut.

About Orbital IT

AI Accelerated Design and Implementation

From first brief to construction-ready specification, the Orbital IT team brings engineering and procurement capabilities that compress the path from customer brief to validated design and on-site implementation. Deployment-agnostic across greenfield, brownfield, or alongside existing facilities.

Engineered with you.

Our engineering team works alongside yours from the first scoping conversation, covering thermal and electrical design, and procurement. AI-assisted CFD (computational fluid dynamics) lets us simulate thousands of configurations before any metal is cut: rack layout, major components, power distribution architecture, all tested against your specific power profile, density target, and footprint.

Up to 250 kW per rack today.

Orbital IT engineers for the latest AI silicon, including the NVIDIA GB200, GB300, and Vera Rubin platforms and AMD's MI400-class accelerators, with single-phase direct-to-chip cooling.

How we work

Engineer

We survey your site and model the thermal and electrical loads your deployment needs to carry. AI-assisted CFD verifies the cooling architecture against your specific GPU density, rack layout, and footprint.

Validate

We validate every specification against your power profile, density target, and site constraints, producing designs ready for the manufacturing floor.

Procure

We oversee procurement of every component to specification, coordinating with suppliers and working with your teams on-site to coordinate installation and integration.

Talk to our team

Tell us your deployment timeline, site constraints, and target rack density. We'll come back with a technical scoping session and a proposal designed for your deployment.